PHASE 2 PROJECT PHOTOS – CONSTRUCTION PHOTOS

Tying the rebar mats at Elev. 4-Stair -2 2nd Floor Facing South (800x600).jpg Stripped foundation walls at Monumental Stairs Facing West (800x600).jpg Footing layout at Elev. 7-Stair -4,5 Facing South-East (800x600).jpg Waterproofing at Foundation Walls at M line Facing South-West (800x600).jpg Setting up the Shear wall Panels at Elev. 4-Stair -2 Facing West (800x600).jpg Started the Footings layout at Elev.7- Stair -4,5 Facing North-West (800x600).jpg
Previous pageNext page Stripped foundation walls at Monumental Stairs Facing West (800x600)
Stripped foundation walls at Monumental Stairs Facing West (800x600)